01New application
Use this route for a new substrate, code, line, or capacity change. Attach representative samples and state the final artwork, smallest required feature, nominal and peak line speed, marking window, product pitch, available installation envelope, and acceptance method.
A recommendation remains conditional until sample results, selected-model documentation, cell interfaces, and the site acceptance plan agree.
02Existing process support
Provide the equipment reference, controlled recipe, exact symptom or alarm, first occurrence, material lot, speed, focus datum, inspection result, safe-state status, and recent material, maintenance, controls, network, or artwork changes.
Do not defeat an interlock or bypass inspection while collecting evidence. Safety, electrical, ventilation, and regulated-quality decisions remain with authorized site personnel.
03Integration review
Share a line drawing or clear photographs together with product motion, trigger and encoder plan, PLC interface, message source, inspection feedback, reject logic, enclosure, extraction, cooling, utilities, and maintenance access.
The review should identify responsibility boundaries among production, controls, safety, quality, maintenance, integrator, and equipment supplier before factory acceptance.